IBM C1000-132 certification exam is designed for professionals who want to validate their skills and knowledge in implementing IBM Maximo Manage v8.0. C1000-132 exam tests the candidate's ability to install, configure, and manage the IBM Maximo Manage v8.0 system. C1000-132 exam covers a wide range of topics, including database configuration, security, workflow management, and integration with other systems. IBM Maximo Manage v8.0 Implementation certification is intended for consultants, system administrators, and architects who work with IBM Maximo Manage v8.0 and want to demonstrate their proficiency to potential employers.


IBM C1000-132 exam is designed for IT professionals who want to demonstrate their expertise in IBM Maximo Manage v8.0 Implementation. IBM Maximo Manage v8.0 Implementation certification exam is the ideal choice for those who want to validate their skills in deploying, configuring, and managing IBM Maximo Manage v8.0 solutions. C1000-132 exam aims to test the candidate's skills in various areas, including understanding Maximo architecture, managing Maximo applications and data, configuring security, and troubleshooting Maximo issues.

 

NEW QUESTION # 22
In the Item Master application can an item be associated with a meter?

  • A. A meter field can only be associated with non-rotating items.
  • B. It cannot be associated with any item.
  • C. A meter field can only be associated with rotating items.
  • D. It can be associated with all items.

Answer: A


NEW QUESTION # 23
In the Budget Monitoring application, where are the budget amounts entered?

  • A. Focal Point
  • B. Budget Record
  • C. Budget Rules
  • D. Budget Line

Answer: D

Explanation:
the budget amounts in the Budget Monitoring application are entered at the Budget Line level. A Budget Line represents a specific account or category within a budget and allows for detailed tracking and analysis of budget data.


NEW QUESTION # 24
What must first be done in order to apply a price adjustment to an Approved Labor Rate Contract?

  • A. Change the contract status to closed.
  • B. Use Edit History Contract from the More Actions menu.
  • C. The contract should be suspended.
  • D. The contract should be revised.

Answer: D


NEW QUESTION # 25
What happens if the Specification of a rotating item is updated in the Item Master application?

  • A. By default, all locations and assets referencing the rotating item will be updated with the changes.
  • B. Only locations inherit the specification from a rotating item and only when new locations are created.Assets only inherit the specification from an asset template.
  • C. New locations and assets that reference the rotating item will inherit the changes, there are no changes to existing locations and assets.
  • D. By default, existing assets referencing the rotating item will be updated with the changes, there are no changes to existing locations.

Answer: A

Explanation:
It works on both locations and assets. https://maximosecrets.com/2020/08/17/item-and-locations/ and
https://maximosecrets.com/2020/08/03/item-specifications-for-rotating-items/


NEW QUESTION # 26
What are two of the filters in the Select Value of a Location or Asset in the Service Requests application?

  • A. User/Custodians
  • B. Public
  • C. Service Address
  • D. Service Group/Services
  • E. Work Zones

Answer: A,B

Explanation:
Two of the filters in the Select Value of a Location or Asset in the Service Requests application in IBM Maximo Manage are Service Address and Service Group/Services
https://www.ibm.com/support/pages/maximo-support-desk-change-default-filter-asset-lookup-create-service- request-application


NEW QUESTION # 27
When working with Purchase Requests, which statement is correct?

  • A. All Purchase Requests must be approved by an authorized person.
  • B. Purchase Request Description is mandatory in the header section.
  • C. One Purchase Request can contain both Item and Material type lines
  • D. Purchase Request must have a vendor specified.

Answer: C

Explanation:
When working with Purchase Requests in IBM Maximo Manage, one Purchase Request can contain both Item and Material type lines.


NEW QUESTION # 28
In the Purchase Requisitions application and with default settings, what status does the Purchase Requisition change to when all of its lines have been copied to a Purchase Order or a Contract?

  • A. CLOSE
  • B. APPR
  • C. COMPLETE
  • D. INPRG

Answer: C

Explanation:
In the Purchase Requisitions application with default settings in IBM Maximo Manage, when all lines of a Purchase Requisition have been copied to a Purchase Order or a Contract, the status of the Purchase Requisition changes to COMPLETE.


NEW QUESTION # 29
What are three integration End Points Handlers available in Maximo Manage?

  • A. XLS
  • B. KAFKA
  • C. EMAIL
  • D. XMLFILE
  • E. FLATFILE
  • F. WSDL

Answer: C,D,E

Explanation:
Three integration End Points Handlers available in Maximo Manage are XMLFILE, EMAIL and FLATFILE.


NEW QUESTION # 30
In the Meters application what are the three meter types?

  • A. GAUGE
  • B. CONTINUOUS
  • C. CONSTANT
  • D. CALIBRATION
  • E. FEATURES
  • F. CHARACTERISTIC

Answer: A,B,F

Explanation:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS. GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine. CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine. CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


NEW QUESTION # 31
A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?

  • A. A Master Job Plan should be created with Tasks for each Asset.
  • B. The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.
  • C. A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.
  • D. A Work Order Hierarchy should be created against the same Job Plan used for all stops.

Answer: B

Explanation:
In IBM Maximo Manage, when the same work tasks need to be applied simultaneously to multiple assets, the recommended method is to use the Multiple Assets, Locations, and CIs table on a single Work Order. This approach allows users to specify multiple assets for the work order without creating separate child work orders or task hierarchies, streamlining record management and reducing complexity.
* Multiple Assets, Locations and CIs Table: This table allows the user to list all assets requiring the same work on a single work order. When tasks are defined on the work order, they apply uniformly across all assets listed in this table. This method is efficient for routine inspections, simple tasks, or other repetitive maintenance where the same task applies to multiple assets
* Routes as an Alternative: A route could also be configured so that each route stop (representing different assets or locations) populates the Multiple Assets, Locations, and CIs table on a single work order when applied. This allows for sequence control and record management while still using a single main work order This setup minimizes the need to manage multiple child work orders or complex work order hierarchies, particularly when performing similar tasks on several assets simultaneously.


NEW QUESTION # 32
Which field on a Work Order is used to only schedule work during working time?

  • A. Interruptible
  • B. Constrain to Shift
  • C. Flow Action Assist
  • D. Split Shift

Answer: A


NEW QUESTION # 33
On a Work Order with no GL Account specified, which GL Account will take precedence?

  • A. Job Plan
  • B. Location
  • C. Asset
  • D. Work Order Control Account

Answer: D


NEW QUESTION # 34
Select all that apply
What is the priority order for selecting a Safety Plan when a Job Plan is applied to a Work Order?

Answer:

Explanation:

Explanation:
In IBM Maximo Manage v8.0 implementation, the priority order for selecting a Safety Plan when a Job Plan is applied to a Work Order is:
* Use the Safety Plan associated with the Asset referenced on the Work Order.
* Use the Safety Plan associated with the Location referenced on the Work Order.
* Use the Safety Plan associated with the Asset's Rotating Item, for the Asset referenced on the Work Order.
* Use the Safety Plan associated with the Location's Rotating Item, for the Location referenced on the Work Order.
This ensures that the appropriate Safety Plan is applied to the Work Order based on the relevant Asset and Location information. If a Safety Plan is not associated with either the Asset or Location referenced on the Work Order, the Safety Plan associated with the Asset's Rotating Item or the Location's Rotating Item may be used as a fallback option. This helps to ensure that worker safety is prioritized and that appropriate precautions are taken when performing work tasks.


NEW QUESTION # 35
In the Security Groups application which security group are all users added to using default settings?

  • A. DEFUSRREG
  • B. DEFLTREG
  • C. NEWUSER
  • D. MAXIMOUSERS

Answer: B


NEW QUESTION # 36
In the Meters application what are the three meter types?

  • A. GAUGE
  • B. CONTINUOUS
  • C. CONSTANT
  • D. CALIBRATION
  • E. FEATURES
  • F. CHARACTERISTIC

Answer: A,B,F

Explanation:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS.
GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine.
CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine.
CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


NEW QUESTION # 37
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with which setting?

  • A. Autonomous
  • B. Separate
  • C. Independent
  • D. Discreet

Answer: C

Explanation:
When users are added to multiple security groups, the authorization privileges of the security groups combine, with the exception of security groups with the "Independent" setting. When a security group has the "Independent" setting, its authorization privileges are applied separately from any other security group that the user belongs to.


NEW QUESTION # 38
In which status can a Job Plan be modified to add a new task?

  • A. PNDREV
  • B. NEW
  • C. INACTIVE
  • D. REVISED

Answer: D


NEW QUESTION # 39
When setting up a Crew Type, Required Crafts and Required Tools can be specified. What other characteristic can be required for the Crew Type?

  • A. Required Labor
  • B. Required Skills
  • C. Required Assets
  • D. Required Qualifications

Answer: D


NEW QUESTION # 40
Which Maximo application can be used to generate replacement plans for assets?

  • A. Maximo Predict
  • B. Maximo Manage
  • C. Maximo Health
  • D. Maximo Health, Safety and Environmental (HSE)

Answer: C

Explanation:
The Maximo Health application can be used to generate replacement plans for assets.


NEW QUESTION # 41
Select all that apply
What is the appropriate order of phases in order to create a workflow process?

Answer:

Explanation:

Explanation:
The appropriate order of phases in order to create a workflow process in IBM Maximo Manage is:
* Create the process: This involves designing the workflow process using the Workflow Designer application, including creating the activities, transitions, and conditions that make up the process.
* Validate the process: This involves ensuring that the process has been designed correctly and meets the desired requirements. This can be done by testing the process and making any necessary adjustments.
* Enable the process: This involves making the process available for use in the system by enabling it in the Workflow Designer application.
* Activate the process: This involves activating the process in the Workflow Administration application so that it is ready for use by the system.


NEW QUESTION # 42
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?

  • A. Make the question response interactive.
  • B. In Form Settings add an Action Script.
  • C. Choose Work Order on question action.
  • D. Create an escalation on the QRESPONSE Object.
  • E. In the Question Options, set the Require action flag.

Answer: B,E


NEW QUESTION # 43
In which three applications can Asset Depreciation be configured?

  • A. Tools
  • B. Item Master
  • C. Locations
  • D. Chart of Accounts
  • E. Assets
  • F. Asset Templates

Answer: C,E,F

Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations


NEW QUESTION # 44
......


To prepare for the IBM C1000-132 exam, candidates can take advantage of various resources provided by IBM, such as training courses, study guides, and practice exams. These resources will help candidates to gain a deeper understanding of the software and its functionalities. Additionally, candidates can benefit from hands-on experience with the software to gain practical knowledge and skills.

 

Authentic C1000-132 Dumps With 100% Passing Rate Practice Tests Dumps: https://www.prep4sureexam.com/C1000-132-dumps-torrent.html

IBM C1000-132 Real Exam Questions Guaranteed Updated Dump from Prep4sureExam: https://drive.google.com/open?id=1Va8pLwMPWtveErXUBNnrqlXaMQj_HMsP