Huawei H19-371_V1.0-ENU (HCS-Pre-sales-Digital Power V1.0) Certification Exam is a professional-level certification exam that is designed to test the skills and knowledge of individuals working in the digital power industry. H19-371_V1.0-ENU exam covers a wide range of topics related to the design, deployment, and management of digital power solutions.
Huawei H19-371_V1.0-ENU Certification Exam is a computer-based exam that consists of multiple-choice questions. H19-371_V1.0-ENU exam is conducted in English and has a time limit of 90 minutes. The passing score for the exam is 60%.
NEW QUESTION # 210
UPS2000-G 6-20k host operation interface is ( ), which can display system status in real time ( )
- A. LED
- B. Remote network management.
- C. LCD
- D. touch screen
Answer: C
NEW QUESTION # 211
The UPS5000-E power module adopts the fan fault-tolerant design.
When two of the fans are damaged, what percentage of the load can the power module still carry?
- A. 0.2
- B. 0.5
- C. 0.6
- D. 0.3
Answer: D
NEW QUESTION # 212
Fusion800 has the function of self-starting of civil air conditioner
- A. True
- B. False
Answer: B
NEW QUESTION # 213
Which of the following statements is false about surveillance cameras?
- A. The number of cameras configured is the same as the number of control sunroofs
- B. Camera data can be stored through TF card or VCN500
- C. The camera can be directly connected to the switch powered by PoE
- D. Less than 4 cameras can be connected to the ETH socket
- E. The camera power supply mode is PoE power supply
Answer: A
NEW QUESTION # 214
UPS000-E has reliable, efficient and simple design features, then which of the following statements about UPS5000-E-400/500K is true ( )
- A. UPS5000-E-400/500K built-in parallel components
- B. UPS voltage input range 138-485Vac
- C. UPS5000-E-400/500K supports upwind
- D. UPS5000-E has two control units
Answer: A,B,C,D
NEW QUESTION # 215
In FusionModule2000, how many cameras can be connected to the DVR? ( )
- A. 32 Road
- B. 16 Road
- C. 8 Road
- D. 64 Road
Answer: B,D
NEW QUESTION # 216
The UPS5000-A supports the adjustable number of battery cells, avoiding the failure of a single battery to cause the replacement of the entire group, and solving the problem of difficult maintenance of traditional UPS batteries ranging from 30 to 40 cells.
- A. False
- B. True
Answer: B
NEW QUESTION # 217
FusionModule500 uses natural heat dissipation
- A. False
- B. True
Answer: B
NEW QUESTION # 218
Power supply architecture supported by half-cabinet chilled water temperature control ( ).
- A. Single power supply
- B. AB are both right
- C. Other.
- D. Dual power supply
Answer: D
NEW QUESTION # 219
Which of the FusionModule800 require site survey? (
- A. The way of the pipe
- B. Wiring method
- C. Mains to Module Cable Length
- D. Length between inside and outside machine
Answer: A,B,C,D
NEW QUESTION # 220
The row-level cold and water-connected intelligent cooling product NetCo15000-C032H adopts the form of running pipes ( )
- A. Side Routing
- B. Pipe up and down
- C. Up the tube
- D. Down the tube
Answer: D
NEW QUESTION # 221
What is the height of the FusionModule2000 cabinet in mm? ( )
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C,D
NEW QUESTION # 222
UPS2000-G is an online double conversion UPS. In normal working state: the mains supply energy, the rectifier converts the alternating current into direct current, and the inverter converts the rectified direct current into pure alternating current and provides it to the load, The charger charges the battery pack ( )
- A. False
- B. True
Answer: B
NEW QUESTION # 223
UPS5000-E (25-125kVA) does not support iBattery function.
- A. True
- B. False
Answer: B
NEW QUESTION # 224
"Data Center Design Specifications" GB50174-2017 stipulates that when selecting a site, a cooling data center should have sufficient water sources.
- A. Indirect fresh air cooling method
- B. Water evaporative cooling method
- C. Chilled water cooling method
- D. Direct ventilation cooling method
Answer: B
NEW QUESTION # 225
The FusionModule2000 battery is listed in the scene, supports up to several battery cabinets (
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 226
The NetEco management system combines the operation and maintenance experience of Huawei I and the process department to launch an electronic remote maintenance module to help the operation and maintenance personnel to complete the daily operation and inspection of the computer room.
Which of the following functions can be achieved: (multiple choice)
- A. Support custom documents for inspection content and inspection routes
- B. Support the generation of road inspection reports in the computer room
- C. Support the formulation of inspection plans, track inspection progress,
- D. With the help of mobile App, you can receive inspection tasks and record the inspection process in vain
Answer: A,B,C,D
NEW QUESTION # 227
The bypass module of UPS5000-E-200K (50kVA power module) is the same as the bypass module of UPS5000-E-300K
- A. True
- B. False
Answer: B
NEW QUESTION # 228
FusionModule1000A V2R3 version prefabricated integrated data center has Najishen solution (multiple choice)
- A. 40-foot CT Solution
- B. 20-foot CT Solution
- C. 40 feet IT solution
- D. 40 feet ICT solution
- E. 20 feet IT solution
Answer: B,C,D
NEW QUESTION # 229
FusionModule2000 v3.0 version intelligent module status indication eLight function description is correct? ( )
- A. None of the above is true
- B. The door frame indicator eLight is only a decorative atmosphere rendering function
- C. The door frame indicator can be associated with the alarm status
- D. The door frame indicator eLight is the module lighting function
Answer: C
NEW QUESTION # 230
UPS2000-G-(6K-20K) maintenance bypass implementation ( )
- A. Optional PDU to support maintenance bypass
- B. Mainframe built-in maintenance bypass
- C. Cannot support maintenance bypass
Answer: A
NEW QUESTION # 231
When multiple FusionModule products are used in the same project, when configuring NetEco, the associated application scenario should be selected ( )
- A. FusionMoudle5000
- B. Associate the FusionMoudle family
- C. FusionModule2000
- D. Customize
Answer: D
NEW QUESTION # 232
......
Candidates who successfully pass the Huawei H19-371_V1.0-ENU certification exam will be considered experts in the field of digital power and will be highly sought after by employers in this industry. HCS-Pre-sales-Digital Power V1.0 certification is a valuable asset for those who are looking to advance their career within the digital power industry, as it demonstrates a deep understanding of the industry and the technologies that are currently available.