Provide Microsoft MB-335 Dumps Updated Jan 09, 2025 With 154 QA's [Q40-Q55]

Share

Provide Microsoft MB-335 Dumps Updated Jan 09, 2025 With 154 QA's

Latest MB-335 Dumps for Success in Actual Microsoft Certified


Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification is designed for professionals who have expertise in implementing, managing, and configuring supply chain management processes in Microsoft Dynamics 365. The Microsoft MB-335 certification exam is a mandatory requirement for acquiring this certification. It is a challenging exam that tests the candidate's knowledge and skills in all aspects of supply chain management.


Earning the Microsoft MB-335 certification is an excellent way to demonstrate one's expertise in Dynamics 365 Supply Chain Management. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification validates the candidate's ability to provide effective supply chain solutions using Dynamics 365. Moreover, holding the MB-335 certification distinguishes an individual in the industry and increases their marketability. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification also open doors to advanced roles such as Dynamics 365 Supply Chain Management Functional Consultant Expert.


Microsoft MB-335 certification exam provides functional consultants with an opportunity to validate their expertise in supply chain management and Microsoft Dynamics 365. By earning the certification, consultants gain credibility and recognition, which can lead to career advancement opportunities. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification exam is a rigorous examination of the candidate's knowledge, skills, and abilities, which ensures that certified professionals understand the functionalities of Dynamics 365 Supply Chain Management and can deliver exceptional results to their clients.

 

NEW QUESTION # 40
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 41
You are the product definition manager for a car manufacturing company. You set up and maintain the production configuration models used at the company.
You must build a new configuration model and Include Constraints in the model.
You need to determine winch constraint type to use tor each scenario.
Which constraint type should you use? To answer, drag the appropriate constraint types to the correct scenarios. Each constraint type may be used once, more than once, or not at all You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point

Answer:

Explanation:

Explanation:


NEW QUESTION # 42
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?

  • A. Create the production order for the limited-edition bicycle and click estimate.
  • B. Run the pricing simulator for the limited-edition bicycle for a quantity of one.
  • C. Run the category price rules for the limited-edition bicycle using a cost-plus calculation.
  • D. Run inventory close for the BOM items for the limited-edition bicycle.

Answer: A


NEW QUESTION # 43
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create cost groups.
2 - Associate cost groups to items and resources.
3 - Create overhead calculation node for materials as sucharge and labor as rate for setup time.
4 - Define the basis for calculation costs as absorption.


NEW QUESTION # 44
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-production-parameters-in-manufacturing-execution


NEW QUESTION # 45
You need to determine the batch values on the combined mix batches for OperatorA.
Which values should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 46
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:

Topic 3, Case Study 3 Adventure Works
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
* Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
* The Street Kid YOLO models sell in different volumes depending on the market.
* The creation of production orders for bicycles occurs monthly and is based on historical sales.
* Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
* A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
* The completed paper is used in the put-away process by the warehouse workers.
Financials
* The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
* Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
* An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
* Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
* A single pilot limited-edition bicycle is created as a proof of concept.
* Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
* Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
* Sales price must be auto calculated after the cost price is derived.
* Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
* All items except for the frame in the prototype process are considered finished items and can be sold individually.
* The frame items require modifications in accordance with the manufacturing process as well as painting.
* Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
* Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
* Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
* AWIN must be able to sell only standard model bicycles.
* AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
* Warehouse workers must use the Warehouse Management mobile application to manage all inventory
* inbound and outbound from the warehouse.
Bicycle manufacturing
* The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
* Standard model bicycle production scheduling must be configured to start as soon as possible.
* Bicycle components must be automatically reserved when the item is released to the production floor.
* Standard model bicycle production must be automatically created on a predefined schedule.
* As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
* Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
* Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
* The system must log the immediate consumption of BOMs for traceability.
* All inventory is warehouse enabled.
* Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
* Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary.
The limited-edition bicycle will be designed for charity events and be produced for the summer season.
* The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
* A limited run of 100 bicycles must be created.
* The limited-edition bicycles must use the same production process as the standard model bicycles.
* The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
* Frames must be painted in-house.
* Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
* Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
* When an order for the new limited-edition bicycle is created, payment must be provided.
* An approval for an order must exist for the order to be processed.
* Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 47
You need to set up the chocolate items.
Which values should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 48
A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.
Purchase orders for a raw material are created more frequently than needed. This results in missed discounts with the vendor who sells the raw material.
The raw material items have a 30-day lead time. The company is willing to delay sales and production order demand that may consume the raw material for up to 15 days to consolidate purchase orders.
You need to configure the setup to include lead time and consolidate purchase orders.
What should you configure?

  • A. positive days
  • B. dynamic negative days and negative days
  • C. dynamic negative days only
  • D. negative days only

Answer: B


NEW QUESTION # 49
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:


NEW QUESTION # 50
A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.
An existing engineering product must be reconfigured for a new product readiness policy.
You need to change the product readiness policy.
Where should you make this change?

  • A. default order settings
  • B. product configuration model
  • C. shared product
  • D. engineering category
  • E. released product

Answer: D

Explanation:
* Product readiness policies are assigned to products at the released product level1. A released product is a product that has been released to one or more legal entities and can be used in transactions2.
* To change the product readiness policy for an existing engineering product, you must go to the Product readiness tab on the Released product details page and select a different policy from the Readiness policy field1.
* The other options are not correct, because they are not related to product readiness policies. Default order settings are used to define how a product is ordered, received, and sold2. A shared product is a product that is defined in the shared product master and can be released to multiple legal entities2. An
* engineering category is a category that is used to group engineering products by their characteristics3. A product configuration model is a model that defines the options and rules for configuring a product.


NEW QUESTION # 51
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
A screenshot of a computer Description automatically generated


NEW QUESTION # 52
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen A client subcontracts production work to a vendor for production operations.
You need to model subcontracting of route operations in production orders.
Solution: Ensure that subcontracting of route operations supports back-flush costing.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: B


NEW QUESTION # 53
A company uses Dynamics 365 Supply Chain Management.
The marketing group needs to be able to view a manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item when the cost of the BOM item is calculated.
You need to configure the functionality.
What should you do?

  • A. Set the sales price model field on the calculation group to item sales price.
  • B. Use the category price rules to generate a trade agreement with the sales price.
  • C. Add a profit setting percentage to a cost group.
  • D. Add a profit setting percentage to the released BOM product.
  • E. Add a profit setting percentage to a calculation group.

Answer: B

Explanation:
* To view the manufacturer's suggested retail price (MSRP) for a new bill of materials (BOM) item, you need to configure a calculation group with a profit setting percentage. A calculation group is a group of
* settings that determine how the cost and sales price of a BOM item are calculated1. A profit setting percentage is a percentage that is added to the cost of a BOM item to calculate the sales price2. You can specify a profit setting percentage for each calculation group on the Calculation groups page3.
* When you calculate the cost and sales price of a BOM item, you must select a calculation group on the Calculations page. The calculation group determines the cost model and sales price model that are used for the BOM calculation. The cost model defines how the cost of the BOM item is calculated based on the cost categories and cost groups of the components and operations. The sales price model defines how the sales price of the BOM item is calculated based on the profit setting percentage and the cost model.
* By using a calculation group with a profit setting percentage, you can view the MSRP for a new BOM item when you calculate its cost and sales price. The MSRP will be shown as the calculated sales price on the Calculate item cost page. You can also view the calculation details and see how the profit setting percentage is applied to the cost of the BOM item.
* The other options are not correct, because they do not allow you to view the MSRP for a new BOM item when you calculate its cost. Setting the sales price model field on the calculation group to item sales price would use the existing sales price of the BOM item from the Item price page, instead of calculating a new sales price based on a profit setting percentage. Using the category price rules to generate a trade agreement with the sales price would create a trade agreement line for the BOM item based on its category, but it would not show theMSRP when you calculate its cost. Adding a profit setting percentage to the released BOM product or to a cost group would have no effect, because these entities do not affect how the sales price of a BOM item is calculated.
1: Calculation groups 2: Profit settings 3: Create or modify calculation groups : [BOM calculations] : [Cost models and sales price models] : [Calculate costs and prices for manufactured items] : [Category pricing rules]


NEW QUESTION # 54
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.

Answer:

Explanation:

Explanation:


NEW QUESTION # 55
......

Changing the Concept of MB-335 Exam Preparation 2025: https://www.prep4sureexam.com/MB-335-dumps-torrent.html

Getting MB-335 Certification Made Easy: https://drive.google.com/open?id=1M9pliiRv_pSbceJYRIbvEpqCj2RxQDDX