NEW QUESTION # 10
View the Exhibit.
You are reviewing a VxRail Pre-Installation Site Checklist.
What conclusion can be drawn about the VxRail deployment from the exhibit?
- A. Upstream switches will have two ISLs
- B. Two Upstream switches will be used
- C. Two Top of Rack (ToR) switches will be used
- D. Top of Rack (ToR) switches will use two uplink ports
Answer: A
NEW QUESTION # 11
What is the minimum VxRail version that supports a SmartFabric configuration on a VxRail Cluster?
- A. 4.5.225
- B. 4.7.100
- C. 4.5.300
- D. 4.7.000
Answer: D
NEW QUESTION # 12
An S SeriesVxRail cluster has just been deployed. When attempting to enable compression, the option is grayed out.
What is the cause of this situation?
- A. Compression is not supported on the S Series
- B. "Add disks to storage" is set to automatic
- C. Erasure Coding is not enabled
- D. Erasure Coding is not disabled
Answer: B
NEW QUESTION # 13
Which model of VxRail node supports the lowest number of disk groups?
- A. P Series
- B. E Series
- C. S Series
- D. G Series
Answer: D
NEW QUESTION # 14
You are performing a troubleshooting steps on a 4 node VxRail cluster. The cluster uses Erasure Coding for all VMs. When you attempt to put a node into maintenance modeusing the recommended vSAN data migration policy, the operation fails.
What could be done to successfully put the node into maintenance mode?
- A. Storage vMotion the VMs off the node
- B. Cold migrate the VMs off the node
- C. Use the 'No Data Migration' option
- D. Use the 'Full Data Migration' option
Answer: D
NEW QUESTION # 15
An implementation engineer is planning to deploy a new VxRail cluster.
How long is the evaluation period for vSphere licensing on each node?
- A. 90 days after nodes are delivered
- B. 60 days after nodes are delivered
- C. 90 days after nodes are powered on
- D. 60 days after nodes are powered on
Answer: D
NEW QUESTION # 16
A VxRail cluster is being deployed with an external vCenter Server.
What role needs to be assigned to the new VxRail Management User account within vCenter?
- A. No specific role
- B. Trusted Infrastructure Administrator
- C. Read-only
- D. Administrator
Answer: A
NEW QUESTION # 17
For which VxRail models must the iDRAC NIC Selection be set to Dedicated?
- A. E, P, S, and V Series only
- B. D, G, P, S, and V Series
- C. D, E, and G Series
- D. D, E, P, S, and V Series
Answer: D
NEW QUESTION # 18
What is the name of the default port group with VLAN ID 3939 on an unconfigured VxRail node?
- A. Discovery Network
- B. Management Network
- C. Private Discovery Network
- D. Private Management Network
Answer: D
NEW QUESTION # 19
What are the minimum requirements for a customer-supplied VDS in a VxRail deployment?
- A. 4 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN - B. 4 uplinks
Port groups for Discovery, Management, vMotion, and vSAN only - C. 2 uplinks
Port groups for Discovery, Management, vCenter Server, vMotion, and vSAN - D. 2 uplinks
Port groups for Discovery, Management, vMotion, and vSAN
Answer: C
NEW QUESTION # 20
A company needs to enable vSphere GPU capabilities on their VxRail cluster. To do so, they need to purchase a specific entitlement.
What licensing satisfies this requirement?
- A. vSAN Advanced Edition
- B. vSAN Enterprise Plus Edition
- C. vSphere Enterprise Plus
- D. vSphere Standard
Answer: C
NEW QUESTION # 21
After finishing the rack and stack of a VxRail Model G410 cluster, in which sequence should the nodes be powered on?
- A. All four at the same time
- B. Reverse order (4 - 1)
- C. Forward order (1 - 4)
- D. Any order possible
Answer: B
NEW QUESTION # 22
An implementation engineer wants to check if the new node they added to the cluster is accessible to VxRail Manager.
What can be used for discovery?
- A. Marvi
- B. Loudmouth
- C. DRS
- D. SRS
Answer: B
NEW QUESTION # 23
Which user provided block of IP addresses to the VxRail initialization wizard may contain non-contiguous addresses?
- A. NTP Servers
- B. ESXi host
- C. VMware Virtual SAN
- D. vSphere vMotion
Answer: A
NEW QUESTION # 24
How long is the grace period for the vSphere evaluation licenses in a new VxRail implementation?
- A. 45 days
- B. 90 days
- C. 30 days
- D. 60 days
Answer: D
NEW QUESTION # 25
A systems engineer needs to ensure that the VxRail system is healthy and any issues found are addressed prior to starting an upgrade process.
Where in the vSphere Client can they review alarms and overall vSAN health?
- A. Monitor > All Issues > Issues and Alarms
Monitor > vSAN > Health - B. Monitor > Issues and Alarms > All issues
Monitor > vSAN > Skyline Health - C. Triggered Alarms > All Issues > Issues and Alarms
Triggered Alarms > vSAN > Health - D. Triggered Alarms > Issues and Alarms > All issues
Triggered Alarams > vSAN > Skyline Health
Answer: B
NEW QUESTION # 26
The vCenter managing a VxRail cluster must be able to support both Enhanced Linked Mode and vSAN Encryption.
What is the correct configuration to satisfy this requirement?
- A. External vCenter External PSC
- B. Embedded vCenter External PSC
- C. Embedded vCenter Embedded PSC
- D. External vCenter Embedded PSC
Answer: A
NEW QUESTION # 27
What would be the result if no value is entered for "NTP Server(s)" in the First Run Wizard during VxRail deployment?
- A. Time is set to UTC
- B. Validation test fails
- C. Time from the BIOS on the first ESXi host is used
- D. Review and Validate screen shows a red "X"
Answer: C
NEW QUESTION # 28
In a VxRail internal vCenter deployment, which component(s) are automatically licensed?
- A. None
- B. vSAN only
- C. vCenter only
- D. vCenter and vSAN
Answer: B
NEW QUESTION # 29
What is a valid 2-node VxRail cluster in a direct-connect configuration?
- A. D Series with 4x 25 GbE and internal vCenter
- B. E Series with 2x 1 GbE and 2x 10 GbE and external vCenter
- C. G Series with 4x 10 GbE and external vCenter
- D. P Series with 2x 1 GbE and 2x 10 GbE and internal vCenter
Answer: B
NEW QUESTION # 30
You want to deploy VxRail, leveraging your existing VMware SSO domain.
What is the recommended method?
- A. Configure Embedded vCenter in Enhanced Linked Mode
- B. Deploy Embedded vCenter with Embedded PSC
- C. Deploy External vCenter with no PSC
- D. Deploy to an External vCenter
Answer: D
NEW QUESTION # 31
What is a requirement to set up a supported VxRail Stretched Cluster?
- A. VxRail nodes with 10 GbE
- B. All-Flash configuration
- C. G560 with one chassis
- D. Identical VxRail nodes
Answer: A
NEW QUESTION # 32
What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?
- A. External vCenter server must be upgraded after the VxRail is upgraded
- B. Secure boot must be enabled on the ESXi hosts for a successful upgrade
- C. vCenter Server requires a temporary IP address on a different subnet before the upgrade
- D. VxRail Manager VM must be changed to the default name to avoid an upgrade failure
Answer: C
NEW QUESTION # 33
A company is planning to deploy their Virtual Desktop Infrastructure on VxRail. The solution should support 2D and 3D high end visualization.
Which VxRail license is required for this solution?
- A. vSphere Enterprise
- B. vSphere with Operations Management Enterprise
- C. vSphere Enterprise Plus
- D. vSphere Standard
Answer: C
NEW QUESTION # 34
......
Powerful D-VXR-DY-23 PDF Dumps for D-VXR-DY-23 Questions: https://www.prep4sureexam.com/D-VXR-DY-23-dumps-torrent.html
2024 Realistic D-VXR-DY-23 Dumps Exam Tips Test Pdf Exam Material: https://drive.google.com/open?id=17MgJ2Bo0zDhXkdYj_YN2B06PJtq0sZqW